NumberDocument name1 Scoping Report PDF, 12.45 MB 2 Covering letter: scoping report (no personal data – redact as appropriate please) PDF, 93.22 KB 3 SGC Scoping Opinion PDF, 43.06 KB 4 Application form (no personal data) PDF, 375.63 KB 5 Covering letter: planning submission PDF, 37.34 KB 6 Planning Supporting Statement PDF, 8.66 MB 7 Planning Supporting Statement: Appendix B: Statement of Community Involvement PDF, 6.1 MB 8 Environmental Statement: Non-technical summary PDF, 911.39 KB 9 SGC Map: Tytherington quarry PDF, 65.25 KB 10 Environmental Statement: Chapters 1-5 PDF, 817.7 KB 11 Environmental Statement: Appendix 1A: Glossary PDF, 604.09 KB 12 Environmental Statement: Figure 1.1: Site location PDF, 3.82 MB 13 Environmental Statement: Figure 1.2: Land ownership and extant planning consent boundaries PDF, 537.11 KB 14 Environmental Statement: Figure 3.1: Phase 1 PDF, 1.17 MB 15 Environmental Statement: Figure 3.2: Phase 2 PDF, 1.22 MB 16 Environmental Statement: Figure 3.3: Phase 3 PDF, 1.18 MB 17 Environmental Statement: Figure 3.4: Restoration plan PDF, 1.37 MB 18 ES Appendix 3A: Tytherington quarry: Composite IDO and ROMP restoration proposals (March 2011) PDF, 2.2 MB 19 Environmental Statement: Chapter 6 – Landscape and visual PDF, 1.03 MB 20 Environmental Statement: Appendix 6A – Landscape and visual /methodology PDF, 795.49 KB 21 Environmental Statement: Figure 6.1: LVIA study area (map) PDF, 5.59 MB 22 Landscape and Biodiversity Enhancement Plan (28.05.24) PDF, 2.89 MB 23 Environmental Statement Chapter 7: Noise PDF, 821.51 KB 24 Environmental Statement: Appendix 7A: Baseline PDF, 1017.71 KB 25 Environmental Statement: Appendix 7B: Noise level predictions PDF, 1.11 MB 26 Environmental Statement: Figure 7.1: Noise sensitive receptors and baseline noise survey locations PDF, 522.2 KB 27 Environmental Statement Chapter 8: Vibration PDF, 868.47 KB 28 Environmental Statement Chapter 9: Water environment PDF, 1.75 MB 29 Environmental Statement: Appendix 9A: Borehole log Bristol Avon River Authority (borehole Tytherington 1 from 1972) PDF, 1.64 MB 30 Environmental Statement: Appendix 9B: Borehole logs and construction details for piezometers 1 to 6 from ENTEC (1998) PDF, 1.32 MB 31 Environmental Statement: Appendix 9C: Borehole logs for piezometers 8_21 and 9_21 from GWP (2022) PDF, 1.11 MB 32 Environmental Statement: Appendix 9D: Ponds only (potential receptors included in the Water Environment Assessment) PDF, 675.84 KB 33 Environmental Statement Figure 9.1: Water environment study area PDF, 5.01 MB 34 Environmental Statement Chapter 10: Biodiversity PDF, 816.5 KB 35 Environmental Statement Chapter 10: Biodiversity: Addendum (13.11.24) PDF, 40.84 KB 36 Environment Statement: Appendix 10A: Preliminary ecological appraisal PDF, 5.83 MB 37 Environmental Statement: Appendix 10B: Landscape and Biodiversity Enhancement Plan PDF, 2.89 MB 38 Environmental Statement: Appendix 10C: Arboricultural Impact Assessment PDF, 2.51 MB 39 Environmental Statement: Appendix 10D: Bat technical note (13.11.24) PDF, 2.14 MB 40 Environmental Statement: Appendix 10E: Ecological Method Statement (13.11.24) PDF, 3.32 MB 41 Environmental Statement Chapter 11: Traffic and transport PDF, 774.63 KB 42 Environmental Statement Chapter 12: Socio-economics PDF, 723.55 KB 43 Environmental Statement Chapter 13: Climate change resilience PDF, 756.43 KB 44 Environmental Statement Chapter 14: Climate change – greenhouse gas emissions PDF, 857.48 KB 45 Environmental Statement: Chapter 15: Cumulative effects PDF, 771.06 KB 46 Flood Risk Assessment (FRA) report PDF, 8.6 MB